Increasing the Efficiency and Productivity in the Production of Low Voltage Switchboard Using Resource Constrained Project Scheduling

Tannady, Hendy and Maimury, Yona (2018) Increasing the Efficiency and Productivity in the Production of Low Voltage Switchboard Using Resource Constrained Project Scheduling. JIEM: Journal of Industrial Engineering and Management, 11 (1). pp. 1-11. ISSN 2013-0953

[img]
Preview
Text
Increasing the Efficiency and Productivity in the Production of Low Voltage Switchboard Using Resource Constrained Project Scheduling.pdf

Download (6MB) | Preview

Abstract

Purpose: This research was made with the aim to give a scheduling proposal for the assembly activity and the proposal to allocate those activities into available resources using the resource-constrained project scheduling. Design/methodology/approach: The research begins with the problem exposition in the existing system on the Assembly Department of panel manufacturer company. To overcome the problem, several scheduling alternatives are formulated to yield better productivity. The performance of proposed system using RCPS is assessed using simulation method. Considering the circumstance of demand rate, the scenarios chosen are based on the parameter such as product departure cycle time, resource utilization, product output, and number of resource required. Findings: The scheduling alternatives provides the better arrangement of work elements in the assembly activity, especially for the product that represent the highest demand rate. For further research, the paper gives encouragement so that the application of RCPS can be used broader in the manufacturing area. Research limitations/implications: Although the findings were addressed to improve the existing system on the Assembly Department, the practical application haven’t been undergone and the performance assessment only based on the simulation method. Practical implications: By implementing the proposed scheduling, the company will experience several benefits. First, the company could increase its productivity by better utilization of its resources. Second, based on the simulation result, the company could avoid the backorder option while dealing with the high demand rate, and even can fully maximize its resource utilization without adding more worker or apply the overtime policy. Finally, the proposed scheduling that converted into the work instruction could help the company to perform the knowledge transfer from the existing worker or resigned worker to the newly-hired worker. Originality/value: The outcome of the research could become the guidance for other companies which have similar assembly system to apply the same method. This is the best paper that represents the application of RCPS in the large-sized component assemblies, where the walking worker is responsible for carrying tasks to each unmoved unit.

Item Type: Article
Keywords: resource-constrained project scheduling, made-to-order, ACTIM, ACTRES, TIMERES, assembly system, simulation
Subjects: 600 Technology (Applied Sciences) > 620 Engineering
600 Technology (Applied Sciences) > 650 Management and Public Relations > 658 General management (Risk Management, Profit and Loss, Logistics) > 658.4 Executive Management > 658.404 Project Management
Divisions: Faculty of Business > Management
Depositing User: Administrator UMN Library
Date Deposited: 23 Oct 2023 02:09
Last Modified: 23 Oct 2023 02:09
URI: https://kc.umn.ac.id/id/eprint/26978

Actions (login required)

View Item View Item